DEAS/Physics Safety Committee
Wednesday, May 10, 2000
Noon-1:00PM
McKay Laboratories - (Steve Shepard, Bivash Dasgupta, Andrea Santoro, Nan Shen)
- Rm 227 - postdoc is leaving; room will be cleaned up.
- Signs in Tinkham group were updated.
- Rm 213 - room will be under construction.
- Rm 513 - There are no bio hazards.
- Rm 519 - Sign has been updated with laser class.
- Rm 525 - Group members have been instructed to fill out tags correctly; signs updated.
- Rm 502 - Will install fire extinguisher. All signs updated. Tanks will be mounted.
- Rm 503 - Chemicals have been removed from the flammable metal cabinet.
- Rm 512 - Will evaluate for interlocks.
- Rm 427 - Tanks are ok.
- Rm 322 - Room has been cleaned up.
- Rm 329 - Label updated; sign added; SAA cleaned up.
ESL/HEPL Laboratories - (Bivash Dasgupta)
- Signs have been installed in HEPL; emergency exit signs have been posted.
- ESL 215 - SAA sticker is in correct place.
- ESL 214 - Power cord will be protected.
- ESL 213 - Warning lights not needed.
Cruft & Pierce Laboratories - (Yuki Sugimura)
- Report was not presented. Will be emailed to Lenny at a later date.
Rob Stanhope read the names of people needing retraining.